Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

G Line Improvements Project Community Meeting

Marvin Braude Constituent Center 6262 Van Nuys, Van Nuys, CA, United States

Join us!  The G Line (Orange) Improvements Project will bring upgrades to the existing line with grade separations on major streets, better signal priority technology, electronic bus connectivity, a four-quadrant gating system for a faster trip, and bike path improvements.  Please join us at our upcoming community meeting to receive the latest updates on the […]

Sepulveda Transit Corridor – Spring Virtual Community Meeting

Virtual Meeting CA, United States

Metro has a plan to make it easier to get around. The natural barrier created by the Santa Monica Mountains makes traveling between the Valley and the Westside complex and challenging – and will require innovation and multiple solutions. Metro is working to evaluate alternatives for a high-quality, reliable transit service option connecting the San […]

San Gabriel Valley Service Council

3449 Santa Anita Ave, El Monte, CA 91731 3449 Santa Anita Ave, El Monte, CA, United States

Participate by Zoom: Online: https://us02web.zoom.us/j/87695451647 By phone: Dial 213 338 8477 or 888 475 4499 (Toll Free) Webinar ID: 876 9545 1647, Passcode: 734758 Meeting Agenda Agendas for previous meetings Metro El Monte Division 9 Building Third Floor Service Council Conference Room 3449 Santa Anita Ave. (Santa Anita Ave. & Ramona Blvd.) El Monte, CA […]

Sepulveda Transit Corridor – Spring Community Meeting #2

Westwood United Methodist Church 10497 Wilshire Blvd, Los Angeles, CA, United States

Metro has a plan to make it easier to get around. The natural barrier created by the Santa Monica Mountains makes traveling between the Valley and the Westside complex and challenging – and will require innovation and multiple solutions. Metro is working to evaluate alternatives for a high-quality, reliable transit service option connecting the San […]

Bike, Walk, Breathe Event – The Pointe Plaza, Burbank

The Pointe Plaza 2900 W Alameda Ave, Burbank, United States

Discover everything you need to prepare for Bike to Work Day, explore sustainable transportation options, and gather valuable resources from health and community representatives. Gear up for Bike to Work Day with complimentary bike check-ups from Hoopty Bikes and refurbished bike sales from Burbank Bike Angels. Plus, we will have representatives from local bike shops, […]

Planning and Programming Committee

1 Gateway Plaza, 3rd Floor Board Room, Los Angeles, CA 90012 1 Gateway Plaza, Los Angeles, CA, United States

Agenda & Reports 

Finance, Budget, and Audit Committee

1 Gateway Plaza, 3rd Floor Board Room, Los Angeles, CA 90012 1 Gateway Plaza, Los Angeles, CA, United States

Agenda & Reports 

FY25 Budget Public Hearing

One Gateway Plaza, 3rd Floor Board Room, Los Angeles, CA 90012

Metro’s FY25 Proposed Budget is available for public review and comment: FY25 Proposed Budget FY25 Budget Summary A public hearing will be held to approve the budget at the Finance, Budget, and Audit Committee Meeting on May 15th, 2024. Watch online: http://boardagendas.metro.net Listen by phone: Dial 202-735-3323 and enter Access Code: 5647249# (English) or 7292892# (Español) […]

Bike, Walk, Breathe Event/Pit Stop – Burbank Metrolink Station

Burbank Metrolink Train Stration 201 N. Front St., Burbank

Stop by the Burbank TMO pitstop at the Downtown Burbank Metrolink Station (201 N. Front Street Burbank)  from 3:30 to 6:00 pm, where BTMO will be stationed with bike-related giveaways, prizes, and transportation resources.  

Metro G Line Improvements Project Virtual Community Meeting

Virtual Meeting CA, United States

Join us!  The G Line (Orange) Improvements Project will bring upgrades to the existing line with grade separations on major streets, better signal priority technology, electronic bus connectivity, a four-quadrant gating system for a faster trip, and bike path improvements.  Please join us at our upcoming community meeting to receive the latest updates on the […]

Construction Committee

1 Gateway Plaza, 3rd Floor Board Room, Los Angeles, CA 90012 1 Gateway Plaza, Los Angeles, CA, United States

Agenda & Reports 

Scroll to Top